Concrete Mixer Pump Maintenance

1. Before operation every day, add only water in the mixing hopper and make it rotate for one or two seconds. Check the operation reliability of clutch and brake equipment at the same time.
2. In the process of operation, it is necessary to check whether the noise of motor, reducer and transmission gear is normal and the temperature is too high.
3. Every time, after starting up the concrete mixer pumping machine, it’s necessary to check whether the operation of each part is normal. Check whether the blade of the concrete mixer is bent and whether the screws are falling or loose.
4. Ensure the concrete mixer pump is clean. Remove the dirt and other impurities thoroughly.
5. Check the lubrication of oil, circuit and control equipment, and add lubricating oil as required before the operation every day.
6. It is necessary to adopt the two-level leakage protection for concrete mixer with pump. Before operation, connect the power supply first and then check carefully. The normal operation can only be performed after the empty equipment test turns out to be qualified.
7. Check whether the transmission clutch and brake are sensitive and reliable before operation every day. And check whether the wire rope is damaged, whether the track pulley is good, whether there is barrier and the lubrication situation of the parts.
8. After the construction is finished each time, the concrete mixing pump must be cleaned. Normally, the equipment need to be maintained after a period of construction. In addition to routine maintenance, further maintenance is needed, check and adjust the brake clearance.

Please feel free to give your inquiry in the form below. We will reply in 24 hours.
Product Model:

Your Name(required):

Your Email(required):

Your Tel:

Your country:

Your Company:

Your Message(required):

Leave a Comment

Name:*

Email:*

Phone

Message:*